Project name項目名稱 | Wenzhou Oubei Bridge溫州瓯北(běi)大(dà)橋 |
Construction unit建設單位 | CCCC First Public Bureau Second Engineering Co., Ltd.中(zhōng)交一(yī)公局第二工(gōng)程有限公司 |
Construction unit項目描述 | The Oubei Bridge Project is a key project in Zhejiang Province, with a total length of 1073.568 meters. During the construction, the project insisted on quality first and scientific and technological breakthroughs. The project "Research on Construction of Large-Volume Steel Sheet Pile Cofferdam in Deep-water Tidal Waters" won the third prize of National Highway Engineering Science and Technology Innovation Achievement Award, and 3 technologies won the National Innovation Patent, 4 achievements won the provincial excellent QC achievement award. At the handover acceptance meeting, the acceptance team, through listening to reports and on-site inspections, unanimously believed that the Oubei Bridge project process control was strict, the appearance quality was good, the project quality was reliable, and the sub-division projects met the design and various specifications. On March 28, the Oubei Bridge project of CCCC No. 1 Public Bureau No. 2 Company successfully passed the acceptance inspection. 瓯北(běi)大(dà)橋工(gōng)程爲浙江省重點工(gōng)程,全長1073.568米,爲獨塔雙索面疊合梁斜拉橋。施工(gōng)建設中(zhōng),該項目堅持質量當先,科技攻關,項目《大(dà)體積承台鋼闆樁圍堰在深水潮汐水域施工(gōng)研究》獲國家公路工(gōng)程科技創新成果三等獎、3項技術獲國家創新型專利、4項成果獲省級優秀QC成果獎。在交工(gōng)驗收會上,驗收小(xiǎo)組通過聽取彙報和實地考察,一(yī)緻認爲瓯北(běi)大(dà)橋工(gōng)程工(gōng)序控制嚴格,外(wài)觀質量良好,工(gōng)程質量可靠,各分(fēn)項分(fēn)部工(gōng)程符合設計及各項規範要求,2015年1月28日,中(zhōng)交一(yī)公局二公司瓯北(běi)大(dà)橋工(gōng)程順利通過交工(gōng)驗收。 |
Supply product供應産品 | Squeezing material壓漿料 |