Project name項目名稱 | New Nangang Bridge新南(nán)港大(dà)橋 |
Construction unit建設單位 | China Railway Eleventh Bureau Group Co., Ltd.中(zhōng)鐵十一(yī)局集團有限公司 |
Project description項目描述 | The Minhou New Nangang Bridge and its connection project started from Liufenzhou, Nanyu, Minhou County, and passed through Liufenzhou Village. The newly built Nangang Bridge crossed Dazhangxi and Chencuo River, temporarily connected to the planned Nantong Avenue, and finally wholesaled in Haixi. Market Road A, with a total length of 2.57 kilometers, of which the bridge is about 1,640 meters, is constructed according to the standard of Class I highway and urban Class I main road, with a design speed of 60 km/h; in order to strengthen the connection between this project and Provincial Highway 203, the construction will be carried out simultaneously. The connecting line of Jiangbin Road is 3.6 kilometers. The starting point of the connecting line of Jiangbin Road is connected with the Nanyu auxiliary road of the new Nangang Bridge. The original Nanyu Avenue is used for reconstruction and expansion, and finally the bridgehead of the existing Nangang Bridge is taken into account by the first-class highway and the city's first-class main road. Standard construction with a design speed of 60 km/h.閩侯新南(nán)港大(dà)橋及接線工(gōng)程起于閩侯縣南(nán)嶼六十分(fēn)洲互通,經六十分(fēn)洲村(cūn),新建南(nán)港大(dà)橋跨越大(dà)樟溪、陳厝河,暫接規劃的南(nán)通大(dà)道,終于海西批發市場A号道路,全長2.57公裏,其中(zhōng)橋梁約1640米,按一(yī)級公路兼顧城市Ⅰ級主幹道标準建設,設計速度60公裏/小(xiǎo)時;爲加強本項目與省道203線的銜接,同步建設江濱路連接線3.6公裏,江濱路連接線起點與新南(nán)港大(dà)橋的南(nán)嶼輔路相接,利用原南(nán)嶼大(dà)道改擴建,終于現有南(nán)港大(dà)橋橋頭,按一(yī)級公路兼顧城市Ⅰ級主幹道标準建設,設計速度60公裏/小(xiǎo)時。 |
Supply product供應産品 | Squeezing agent,squeezing material,grouting material壓漿劑、壓漿料、灌漿料 |