Project name項目名稱 | Wenzhou Gate Bridge 1st bid, 2nd bid, 3rd bid溫州大(dà)門大(dà)橋1标、2标、3标 |
Construction unit建設單位 | CCCC No. 3 Aviation Bureau, CCCC No. 1 Public Service Bureau, CCCC No. 2 Aviation Bureau中(zhōng)交三航局、中(zhōng)交一(yī)公局、中(zhōng)交二航局 |
Project Description項目簡介 | Wenzhou Gate Bridge is a highway "Eleventh Five-Year" planning and construction project in Zhejiang Province, and it is a key project in Zhejiang Province. The main line of the first phase of the Gate Bridge project starts at Liuweng Road, Wengyang Town, Yueqing City, crosses the Shatou Waterway to the east, and ends at the southernmost tip of Xiaomen Island in the petrochemical industry base of Wenzhou City. The total length of the route is about 9.32 kilometers, of which the main line is about 7.49 kilometers long (including about 6,160 meters long for the extra-large gate bridge), and the connecting line is about 1.83 kilometers long, with a total investment of 2.035 billion yuan. It is the first super bridge in my country that simultaneously and comprehensively considers high-voltage transmission lines and large-diameter water pipelines to cross the bridge in the design.溫州大(dà)門大(dà)橋是浙江省公路“十一(yī)五”規劃建設項目,屬浙江省重點工(gōng)程。大(dà)門大(dà)橋一(yī)期工(gōng)程主線起點位于樂清市翁垟鎮柳翁公路,向東跨越沙頭水道,終點位于溫州市石化産業基地的小(xiǎo)門島最南(nán)端。路線全長約9.32公裏,其中(zhōng)主線路線長約7.49公裏(含特大(dà)橋大(dà)門大(dà)橋長約6160米),連接線長約1.83公裏,總投資20.35億元。是我(wǒ)(wǒ)國首座在設計時同步綜合考慮高壓輸電線路、大(dà)直徑輸水管線過橋方案的海上特大(dà)橋。 |
Supply product供應産品 | Squeezing material,grouting material壓漿料、灌漿料 |