Product name項目名稱

Zhangzhou Yunping Expressway A2, A5, A6, A9 signs漳州雲平高速A2A5A6A9

Construction unit建設單位

Hunan Road and Bridge Construction Group Co., Ltd., China Railway 24th Bureau, Fujian No. 1 Highway Engineering Company, CCCC No. 1 Public Bureau, Zhejiang Jiaotong Engineering Co., Ltd.,湖南(nán)路橋建設集團有限責任公司、中(zhōng)鐵二十四局、福建省第一(yī)公路工(gōng)程公司、中(zhōng)交一(yī)公局、浙江交工(gōng)、

Project description項目描述

   

The starting point of the project is Wutian, Dongxia Town, Yunxiao County. The Wutian hub is connected to Shenhai Expressway. The end point is near Chishi, Jiufeng Town, Pinghe County. ; The mileage of the main line is 97.792 kilometers (including 78.017 kilometers of newly built mileage and 19.775 kilometers of the same line with the Shenhai double line). Constructed according to the standard of two-way 4-lane expressway, the design speed of the starting point to the Shenhai double-track section is 100Km/h, and the subgrade width is 26.0 meters; the design speed of the Shenhai double-track to the end section is 80km/h, and the subgrade width is 24.5 meters. The main engineering volume of the whole line is 21.43 million m3 of earth and stone, 7.5 tunnels, 1 extra-large bridge, 30 bridges, 133 culverts (passages) (the above data do not include the interchange area), and 9 interchanges.


A2 standard: the total length is 9.131km, the excavation is 806,442 square meters; the fill is 934,594 square meters; the bridge is 520m/2; the culvert is 770.68m/12; the channel is 425.48m/11;


Bid A5: The starting point of the project is near Baonan Village, Banzai Town, Pinghe County. The starting mileage is K56+226.2, which is connected to Shenhai Expressway. The ending point is Lianjian Village, Banzai Town, Pinghe County. middle), the total length of the route is 8.574 kilometers. It is constructed according to the standard of two-way 4-lane expressway, the design speed from the starting point to the end point is 80km/h, and the width of the roadbed is 24.5 meters. Among them, the engineering volume is 1.0399 million cubic meters of earthwork, 0.8 tunnels, 3 bridges, 7 culverts, 2 passages, 2 interchanges, and 1 service area.


Bid A6: The starting point of the project is Wutian, Dongxia Town, Yunxiao County, and the Wutian hub is connected to Shenhai Expressway. The end point is near Chishi, Jiufeng Town, Pinghe County, connecting Guangdong Dapu to Chaozhou Port Expressway Zhangzhou Branch (referred to as Dapu Expressway). Zhangzhou branch line); the main line mileage is 97.792 kilometers (including 78.017 kilometers of newly-built mileage, and 19.775 kilometers of total line mileage with Shenhai double line). Constructed according to the standard of two-way 4-lane expressway, the design speed of the starting point to the Shenhai double-track section is 100Km/h, and the subgrade width is 26.0 meters; the design speed of the Shenhai double-track to the end section is 80km/h, and the subgrade width is 24.5 meters. The main engineering volume of the whole line is 21.43 million m3 of earth and stone, 7.5 tunnels, 1 extra-large bridge, 30 bridges, 133 culverts (passages) (the above data do not include the interchange area), and 9 interchanges.


Bid A9: located in Huangtian Village, Jiufeng Town, Pinghe County, passing through Yangmeiping, Chicaopu, passing through Jiufeng Tunnel, passing Shipaitang, and setting up the Jiufeng Main Line Toll Station (K95+500) at Xiadian, and the end point (Stake No. YK97+ 346.962=ZK97+339.223) is located in Kuishan Village, Changle Township, Pinghe County, connecting Guangdong Dapu to Chaozhou Port Expressway Zhangzhou Branch (referred to as Dazhang Branch). The number of main projects includes 2025.25m/7 main bridges, 1248.1m/1.5 tunnels, 1 overpass of 86m, excavation of 2.9018 million cubic meters (about 29% of the stone), filling of 2.9232 million cubic meters, debit of 516,000 cubic meters, and Jiufeng One toll station on the main line, 13 RC cover culverts (including 7 road diversions), 5 tractor channel culverts, 6 round pipe culverts, there are provincial road S207 around, county road X571 (Xiuxiu Line) and rural areas along the line the way. The contract duration is 24 months, the contract amount is 469,754,009 yuan (including the tentative amount); the defect liability period: 2 years, and the warranty period is 5 years.

項目起點位于雲霄縣東廈鎮浯田,設浯田樞紐互通與沈海高速公路相連,終點位于平和縣九峰鎮赤石附近,接廣東大(dà)埔至潮州港高速公路漳州支線(簡稱大(dà)漳支線);主線裏程97.792公裏(其中(zhōng)新建裏程78.017公裏,與沈海複線共線裏程19.775公裏)。按雙向4車道高速公路标準建設,起點至沈海複線段設計速度100Km/h,路基寬度26.0米;沈海複線至終點段設計速度80km/h,路基寬度24.5米。全線主要工(gōng)程量有土石方2143m3、隧道7.5座、特大(dà)橋1座、大(dà)橋30座、涵洞(通道)133道(以上數據均不含互通區)、互通9處。

A2:全長9.131km挖方80.6442萬方;填方93.4594萬方;橋梁520m/2座;涵洞770.68m/12道;通道425.48m/11道;隧道1969.5m/1.5座;互通1處。

A5标:項目起點位平和縣坂仔鎮寶南(nán)村(cūn)附近,起點裏程K56+226.2,與沈海高速公路相連,終點位于平和縣坂仔鎮聯建村(cūn),終點裏程YK64+800(位于聯建特長隧道中(zhōng)間),路線總長8.574公裏。按雙向4車道高速公路标準建設,起點至終點段設計速度80km/h ,路基寬度24.5米。其中(zhōng)工(gōng)程量有土石方103.99萬方、隧道0.8座、橋梁3座、涵洞7道、通道2道、互通2處、服務區1處。

A6标:項目起點位于雲霄縣東廈鎮浯田,設浯田樞紐互通與沈海高速公路相連,終點位于平和縣九峰鎮赤石附近,接廣東大(dà)埔至潮州港高速公路漳州支線(簡稱大(dà)漳支線);主線裏程97.792公裏(其中(zhōng)新建裏程78.017公裏,與沈海複線共線裏程19.775公裏)。按雙向4車道高速公路标準建設,起點至沈海複線段設計速度100Km/h,路基寬度26.0米;沈海複線至終點段設計速度80km/h,路基寬度24.5米。全線主要工(gōng)程量有土石方2143m3、隧道7.5座、特大(dà)橋1座、大(dà)橋30座、涵洞(通道)133道(以上數據均不含互通區)、互通9處。

A9标:位于平和縣九峰鎮黃田村(cūn),經洋梅坪、赤草埔,穿九峰隧道,經石排堂後在下(xià)店(diàn)設置九峰主線收費站(K95+500),終點(樁号YK97+346.962=ZK97+339.223)位于平和縣長樂鄉葵山村(cūn),接廣東大(dà)埔至潮州港高速公路漳州支線(簡稱大(dà)漳支線),路線總體走向爲南(nán)西至北(běi)西向,路線總長7.737公裏。主要工(gōng)程數量包括主線橋梁2025.25m/7座,隧道1248.1m/1.5座,天橋186m,挖方290.18萬方(石約占29%),填方292.32萬方,借方51.6萬方,設九峰主線收費站一(yī)處,RC蓋闆涵13(含改路7),拖拉機通道涵5道,圓管涵6道,周邊有省道S207,沿線有縣道X571(秀秀線)及鄉村(cūn)道路。合同工(gōng)期24月,合同額469754009元(含暫列金額);缺陷責任期:2年,保修期5年。

 