Fujian Section of Quning Railway衢甯鐵路福建段

Projects > Railway Engineering > Fujian Section of Quning Railway衢甯鐵路福建段

Fujian Section of Quning Railway衢甯鐵路福建段

Project name項目名稱

Quning Railway Fujian Section Project衢甯鐵路福建段項目

Construction unit建設單位

China Railway Fifth Bureau Group Sixth Engineering Co., Ltd.中(zhōng)鐵五局集團第六工(gōng)程有限責任公司

Project description項目描述

This project undertakes the construction of the new Quzhou-Ningde Railway (Fujian section) in front of the station. The main line has a total length of 172.056km. There are 58 large and medium bridges with a total length of 22,414.40 meters on the main line (excluding 12-6643.8 meters of connecting lines and running lines). meters), accounting for 13.0% of the length of the main line, and 48.5 main line tunnels with a length of 124.979km (including the Changpugang Tunnel with a total length of 5939.1m and 1220m in Fujian Province), accounting for 72.6% of the main line. The new Quzhou-Ningde Railway (Fujian section) project has a total of 14 stations, including 1 existing station and 14 new stations, with 876 beams and beams.本項目承建新建衢州至甯德鐵路(福建段)站前工(gōng)程,正線線路全長172.056km,正線共設有大(dà)中(zhōng)橋5822414.40延米(不含聯絡線及走行線12-6643.8延米),占正線線路長度的13.0%,正線隧道48.5124.979km(其中(zhōng)菖蒲崗隧道全長5939.1m,福建省内1220m),占正線72.6%。新建衢州至甯德鐵路(福建段)工(gōng)程共設14個車站,其中(zhōng)既有車站1個,新建車站14個,制、架梁876孔。

 

Supply product供應産品

Superplasticizer減水劑